Ongoing

Pre Bid Engineering

Detail Design

Feasibility Study & DPR

PROJECT MANAGEMENT

Proof Checking

  • Four Laning with paved houlder of NH-6 from Chichra to Kaharagpur (KM. 185.150 TO KM. 134.400) including rehabilation of existing four lane road from KM 134.400 TO KM 129.600 in the state of West Bengal unser EPC mode.
    Client – MCL
  • Constructuion of flyover/underpass for improvement of existing junction at iffco chowk 28.211 on Delhi-Gurgaon Access Controlled Highway on NH-8 in the state of Haryana on EPC mode.
    Client – MCL
  • Constructuion of flyover/underpass for improvement of existing junction at Signature Tower 29.650 on Delhi-Gurgaon Access Controlled Highway on NH-8 in the state of Haryana on EPC mode.
    Client – MCL
  • Constructuion of flyover/underpass for improvement of existing junction at Rajiv Chowk 33.185 on Delhi-Gurgaon Access Controlled Highway on NH-8 in the state of Haryana on EPC mode.
    Client – MCL
  • Rehabilitation and upgradation ofNH-209 from Km 123.550 to Km. 150.400 of Dindigul-Bangalore Road (pollachi to Coimbatore Section) to four lane with paved shoulder in the State of Tamilnadu under NHDP -IV on EPC basis.
    Client – MCL
  • Four laining of Chikhali- Tarsod (Pkg-IIB) Section of NH -6 from km 422.700 to km 510.000 In the state of Maharastra to be executed on Hybrid Annuity Mode under NHDP phase iv.
    Client – MCL
  • Four Laning of Kodinar to Verval section of NH- 8E from Km 221.610 (design chainage Km 222.400) to Km 263.000 (design chainage km 63.180) and from Km 120.900 to Km 121.150 of NH-8D (Package-VI) in the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode under NHDP Phase-IV.
    Client – MCL
  • Widening exiting 2 lane to 2 lane with 1.5m wide paved shoulder from km 0/0 to 81/000 and km 93/0 to 119/0 of NH-157 in the state of Odisha on EPC Mode
    Client – VRC
  • Rehabilitation and up-gradation of Four Laning of Yavatmal to Wardha section of NH-361 from Km 400.575 to Km 465.500 (Package-III) in the state of Maharashtra under NHDP Phase IV on Hybrid Annuity Mode.
    Client – MCL
  • Rehabilitation and up-gradation of 4-Laning of Waranga to Mahagaon (Pkg-I) from km. 253.700 to km. 320.580 section of NH-361 in the State of Maharashtra under NHDP Phase-IV on Hybrid Annuity Mode
    Client – MCL
  • Rehabilitation and up-gradation of 4-Laning of Mahagaon to Yamatamal (Pkg-I) from km. 320.580 to km. 400.575 section of NH-361 in the State of Maharashtra under NHDP Phase-IV on Hybrid Annuity Mode.
    Client – MCL
  • Two Laning with Hard Shoulder of Janjgir – Pamgarh Road Section from Km 0.000 to Km 23.600 in the State of Chhattisgarh on Engineering Procurement & Construction (EPC) Mode
    Client – AIB
  • Rehabilitation and up-gradation of Four/Two laning with paved shoulder of Gadu – Porbandar section of NH-8E from Km 263.200 (design chainage km 287.430) to Km 356.766 (design chainage Km 379.100) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode.
    Client – KCC
  • Rehabilitation and Up- gradation to Two Lanes with paved shoulder / Four lane configurations of (a) Karad- Tasgaon- Jath- Vijapur Road upto Karnataka border road (153 Km) (b) Nagaj Junction at NH 166 to Jath (32 Km) in the State of Maharashtra
    Client – MCL
  • Construction of Jammu ring road/bypass starts from km 85.312 of NH-1A (South West side) and ends at km 15.068 of Nagrota bypass of NH-1A. This bypass/ring road is to be constructed with 4-lane configuration of rigid and flexible type pavement composition in plain and hill section respectively on EPC Mode.
    Client – APCO
  • Upgradation of Chandrapur-Ballarpur-Kothari-Gondpipari-Ashti to two lane with Paved shoulders/ Four lane configuration (Pkg no- PWD/2) in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract
    Client – VRC
  • Consultancy Services for Detailed Design of Four Lanning of Hissar to Dabwali Section from Km 170.000 to Km 227.000 (Pkg-1) with Paved Shoulder in state of Haryana on EPC mode
    Client – GCL
  • Consultancy Services for Detailed Design of Four Lanning of Hissar to Dabwali Section from Km 227.000 to Km 314.660 (Pkg-2) with Paved Shoulder in state of Haryana on EPC mode
    Client – GCL
  • Independent consultant for obtaining technical consultancy services for providing drawing design and estimate for the work of “Proposed RCC open through fo channelization of Badshapur Drain from point K to L.
    Client – HR IRR
  • Development to Four-Lanes with paved side shoulders of End of Patiala Bypass to start of Sangrur Bypass section of NH-64 [New NH No. 7] from existing Km 64/570 to Km 106/170 in state of Punjab under NHDP -IV on Engineering, Procurement & Construction (EPC) Mode
    Client – GCL
  • Development of Four Lanes with Paved Shoulders of Tallewall-Barnala Section of NH-71 from Km 114+000 to Km 149+000 (NH-64)in the state of Punjab on EPC Mode under NHDP-IV
    Client – PLL-VRC (JV)
  • Four laning of Simaria- Khagaria section of NH 31 from KM 206.050 to 266.282.0 (Design Chainage) and (Existing Chainage Km 209.945 to Km 270.000 of NH-31) [Total Design Length – 60.232 km] in the State of Bihar on EPC mode.
    Client – PLL
  • Construction of Gorakhpur bypass from existing km 79.670 of NH-29E to existing km 251.700 of NH-28 in state of Uttar Pradesh on EPC mode under NHDP-IV
    Client – MCL
  • Rehabiliataion and upgradation of NH-200(NH-49) from km 127.500 to km178.994(village-Theka/Darrighat to village Banari section) to four/two lane with paved shoulder in the state of chattisgarh under NHDP-IV on EPC basis
    Client – AIPL
  • Detail design and drawings of Hume pipe culverts, box culverts, slab culverts, and Minor Bridges on Garra-Waraseoni-Movad Road and Seoni-Katangi Bonkatta Road Projects in Maharashtra
    Client – MBL
  • Consultancy services for preparation of detailed project report for 6 laning from existing KM 494.410 to existing Km 509.550 of NH-8 in Gujarat
    Client – KCC
  • Rehabilitation and up-gradation of NH-66 (Erstwhile NH-17) from Km 367+200 to Km 406+030 [Talgaon– Kalmath] to Four lane with paved shoulder in the state of Maharashtra under NHDP –IV on Hybrid Annuity Mode
    Client – KCC
  • Strengthening and Widening/Reconstruction of Chattarpur-Japla) from km 0.00 to 32.466km (MDR-127 Road to two lane with paved shoulder
    Client – Barbrik
  • Four laning of NH-65 from design chainage km 0.000 to design chainage km 50.860 (length =50.860 km) i.e. from beginning of proposed pheowa bypass to end of proposed kaithal bypass.
    Client – Manasvini Infratech Pvt Ltd.
  • Four Laning of Ghagra Bridge to Varanasi Section of NH-233 from km.121.800 to km 180.420(Package-I from Ghagra Bridge abutment on Basti side to Bhudanpur Urban section) in the state of uttar Pradesh under NHDP phase-IV on EPC Mode-(Package-I).
    Client – Dilip Buildcon Ltd.
  • Widening to 4-1ane with paved shoulder with CC pavement from Ion 256/550 to km 289/500 on Kota-Darah Section of NH-I2 (Kota-Jhalawar Road) in the State of Rajasthan on EPC mode.
    Client – MCL
  • Proof checking services for structural consultancy work for Structures on Rehabilitation & Upgrading of Yamuna Nagar – Panchkula Section of NH-73 (Package III Ch 160+357 to Ch 179+249) in the state of Haryana on EPC mode.
    Client – GCL
  • Construction of 3 nos. FOB with Development of whole area & connect as Sky walk in DLF Cyber City

  • 1st Phase of RGCI Expension (Construction of D Block) New Delhi

  • 4/6 of Hisar -Dabwali Section of NH-10 EPC Mode (Haryana) Package -1 (From 170.0 to 227.0)

  • 4/6 of Hisar – Dabwali Section of NH-10 EPC Mode (Haryana) Package -2 (From 227.0 to 314.66)
  • Feasibility study of Proposed Gurgaon Water supply channel of 5.5 Km including pump houses and 8 nos of bridges.

  • Preparation of DPR of upgradation of Fazilpur Chowk Road Connecting to Subhash Chowk and Sohna Road.

  • Preparation of DPR of upgradation of Link Road Between Atul Kataria Chowk to Raajengla Chowk via Sheelta Mata Mandir 14.85 Km.

  • Upgradation of road section from Atul Kataria Chowk to Razangla Chowk Gurgaon in the state of Haryana.
    Client – MCG

Projects